Commercial Pilot Hour Building

    Purpose-built hour building for pilots who already hold a Commercial certificate and are working toward R-ATP, ATP, or a first airline interview.

    The Gap Between Commercial and the Airlines

    A fresh Commercial pilot typically holds 250 hours. An unrestricted ATP requires 1,500 total hours, 500 cross-country, 100 night, 75 instrument, and 50 multi-engine. R-ATP lowers the total to 1,000 or 1,250 hours depending on your degree, but the sub-category minimums remain.

    That is around 1,250 hours of flying to plan, fund, and complete. Doing it at $170/hr costs over $200,000. Doing it at $74/hr costs a fraction of that, which is the entire reason pilots relocate to South Florida for this phase.

    Building the Right Categories, Not Just Totals

    Airline applications are screened on sub-categories as much as totals. Cross-country, night, instrument, and multi-engine PIC are what recruiters look at first.

    We plan blocks so each flight produces multiple qualifying categories. A late-afternoon IFR departure to Tampa returning after dark logs cross-country, night, and instrument in a single trip.

    Multi-Engine Time for Commercial Pilots

    Even 25 to 50 hours of multi-engine PIC materially improves an airline application. Our Piper Seneca and Beechcraft Duchess aircraft are available from $174/hr wet on larger blocks.

    Most commercial pilots in our programme build the bulk of their time in singles and add a concentrated multi block near the end, which is the most cost-effective mix.

    Operating Seven Days a Week

    We fly 12 hours a day, every day of the week, with an in-house 24/7 maintenance team keeping the fleet available. South Florida delivers over 300 VFR days a year, so weather rarely takes a day off your schedule.

    For commercial pilots on a fixed budget and a fixed timeline, availability is worth as much as the hourly rate.

    Mapping Hours to the Commercial Requirements

    The Commercial single-engine requirements combine a total-time figure with specific experience: pilot-in-command cross-country time, night flying including a set number of takeoffs and landings at an airport with an operating control tower, instrument training, and long cross-country flights meeting distance and landing criteria. Building toward the total alone leaves gaps that surface late and cost money to fix.

    We plan the block backwards from those boxes. If you need a long night cross-country with tower-controlled landings, that flight goes on the schedule early rather than being squeezed in during the final week when weather may not cooperate.

    Complex and Technically Advanced Aircraft Time

    Part of the Commercial training requirement must be completed in a complex or technically advanced aircraft. Our glass-panel aircraft satisfy the technically advanced definition, which means the avionics you build hours in are the same class of system you will be examined on — and closer to what you will meet in a modern flight deck than a legacy panel.

    Preparing for the Checkride While You Build

    Commercial manoeuvres reward precision, so we encourage pilots to fold chandelles, lazy eights, eights-on-pylons and precision landings into hour-building flights rather than treating the two phases as separate. Arriving at your checkride prep with those manoeuvres already familiar typically cuts several dual hours off the final phase.

    Frequently Asked Questions

    Commercial Pilot Hour Building — Apply Today

    Related Programs